Section 22 complete - starting to look like an airplane! This section came with some warnings from the forums in that some felt there could have been more details in the plans. The section was only 4 pages long and I spent maybe 10 or so hours of the 28 for this section on one page. In contrast to the last chapter which had 28 pages I believe and took quite a bit of time. In any case, most of the complaints about the drawings were dated and I found it to be 80% there. At this point I think Vans assumes you'll figure it out which isn't hard to do. This will be the last section for 2014 and officially I'm at 2 years on the build which I do believe will complete in 2015. I have a hanger now at KCCR. I've been on the list for about a year at both Buchanan and Byron and both came up at the same time. I choose Buchanan since it's half the distance but it's nearly $120 more per month so the incentive to make use of it and move to Byron is there. For now the mighty C152 has a dry place to hang out. Perhaps a first for the 35 year old bird. I'll continue to keep the project at the house since it's so convenient. The coming steps will be mostly plumbing and the sides and roll bar. After that the tail will go on and it will have to be on it's wheels to make it manageable.
Some of the detail and parts fab. This little bracket was fabricated out of stock 6061 angle. It's cool to make the little parts. |
Another part that needed some fab to complete. Once they go through this they can only be used on one place. |
All fab complete - ready to prime. This took a couple days to get to this point. |
Out of prime - not too many parts on this section. |
All cleco'd up - last check before the rivets go in. It's good to triple check as replacing rivets is a drag. |
Time for the rivet gun. |
Pretty quick work, only a day. This is all on one page except for the diagonal piece which is a optional stiffener. |
Ready to make the final joining. Last check of the documentation. |
Purdy! |
A shot of the engine mounts. These are the lowers. This is also where the nose wheel will attach. |
Ready to attach the firewall shelf. |
The forward and aft sections coming together. |
Progress... |
Section 22 - almost done. Just have to flip it and catch a few more rivets. |
Section 22 complete! |
Time to admire the work of the fall of 2014! |
One more shot... |
Really - just one last angle... |
Who can resit... |
OK - this is it. Time to move on. |
Here's the rivets after the goop and donut process, came out nice. |
Last pic of the goop. |