Finally - the wings are done. I took the spars out of the box about a year ago. I've been staring at this section for way too long. Spent 38 hours in four days for the final push to finish the right wing. This included the lights. By weight the rivet count for this push was 1225. It wasn't difficult since I've been in this section for a long time and thought through much of it while assembling the left wing. I'm so glad to have wings. Once the flaperons are done I can pull down the fuselage and start the last big piece. Flying the -12 at Sun River was the inspiration needed to make the push.
The landing light seemed like a challenge until I dug in. It worked out well though. I kept thinking how would anyone do this post assemble but I'm sure it's been done. |
Was hoping for a better fit at the leading edge. If I push it up tight it fits perfect but once screwed it there's a small gap. |
Down to the close out. |
Finished at last. Keeping the plastic on until complete really helps to keep everything shiny. |
Finish up the nav light and put it away. |
This is the new home for the wings. I'm sure they'll be here for at least a year. |
Section 17 complete! |
No comments:
Post a Comment