The project is an airplane now. The Airworthiness Certificate was issued May 26th, 2017. The DAR was a very nice person and the entire inspection was a non-event. I stressed a bit about registration and certification but it was just the unknown. I knew I'd figure it out when the time came and it really was simple. Two weeks to get the registration in the mail and four days notice to the DAR to come by and inspect the plane.

It's a big step going from project to plane, somewhat melancholy. I know I built it to fly but building it was all I have done for the last four and a half years. There's still stuff to fiddle with - and lots of stuff to learn about it - and of course phase 1 flight testing.

So this should be the last entry to the building of my RV-12. Thanks to all who found this interesting.

New builders who might find this blog useful should note - there's not too much info on mistakes. I made them, tore it apart and fixed them. You will make them. So please, take it apart and do it right.

And finally:
If I had to do it over again...
For the RV-12, no EAB. It's not worth it. Literally any thing you do outside of VANS design will have consequences that only come out in CAD. And if you venture too far out on the EAB limb well - you're on your own.

Primer war comment - having used epoxy primer on the inside of the plane I would not recommend any primer. Most of these planes will outlive the builder or second and possible subsequent owners. It adds weight, adds significant time and messing with paints like this will kill you if you don't respect them.

Still a ways to go before I actually fly it but it is airworthy and I'm sure will be in the air within a week.

Signing off
jimsrv


Sunday, April 30, 2017

Everything in place - build time 1804 hrs

It's time to get the plane on the scales and see what it came in at. I expect it to be a bit heavy due to the primer and I installed every option. Already had an offer on it. I've been in touch with the DAR and he says give him a week lead time and he will come out. I have about 2 weeks of squaks and finish work and I plan on going through the PAP before I call him.






Thursday, March 30, 2017

The Final Chapter

After some 60 or so build chapters I have finally completed the final chapter - installing the control cables. This marks the official milestone that delineates between stuff that hasn't been addressed and going over previous chapters and finishing what needs to be done. Next up is to put the prop back on and get the engine fired up. There's a few weeks of going back over the build book and addressing things I've left until this point but it's moving along.
Within the next couple weeks I'll head over for a few hours transition training in an RV12. I've flown one for an hour already and there's no surprises but since I'll be taking it up for the first time myself and to keep the insurance happy training is in order.
The Skyview is impressive.
d
I'll change how I've tied down these cables next time I go to the airport.

Friday, March 3, 2017

Final Assembly - build time 1696 hrs

Down the final stretch now - putting it all together. This is really fun and while I now have to drive to the airport to work on the plane it's great to hang out and talk with folks that come by to see the project.
First thing I'm working on is getting the panel complete so I can get the systems working. The right panel has been reworked 6 times now - 3 for the gloss black and 3 times with the carbon fiber vinyl.
The original plan of using the gloss black was a good plan but it's really hard to paint that color and get it to look good. The radio stack needed to be refinished after cutting the holes for the auto pilot heads and enlarging the hole for the radio and the left panel came with the sky view and didn't have the intercom cutout so it needed to be finished. At this point I decided to try the vinyl and went ahead and bought $50 worth of it.
I'm really happy with how it turned out. I started with the right panel. For the first shot I tried to start at one edge and pull it on. It stretched and caused wrinkles so that method was out. It will stretch a bit but it's not that flexible. The second attempt went well. I let it warm a bit and placed it on a soft rubber mat and then just stamped the panel into it. That worked very well. I moved onto the radio panel and that came out pretty good but the lines in the pattern were a bit off. I could have lived with it though. Next was the left panel and I was getting pretty good at lining things up by now. That came out nice enough to cause me to take another shot at the right panel. If I had not had enough material I would have left it alone but I had just enough to try it one more time. It came out really nice and I'm glad I did it.
I plan on making sure the power is at the correct pins before I apply any power to any avionics. I expect to have power in the plane within the next couple of days.
Next week I'll be headed down to Chino for the Rotax service and maintenance classes, not cheap, but I always planned on taking these classes. I expect to have the engine running before the end of the month.



Tuesday, February 7, 2017

Painting Complete

After a couple months the plane is now painted. The final stretch for final assembly and airworthiness inspection is insight. The painting took about the time I expected - at least 8 weeks or better. It was a side job for my painter so he fit it in when he could. That coupled with more rain than expected added up to nearly 12 weeks. But it's done now and it looks great. I went down to the shop to approve the layout but really Jaun is the artist and he had a vision. Can't wait to start putting it all together and fire it up. In the time the plane was away I took a small break - it's been 4+ years that I've really focused at on working on this project and the break felt good. I'm a little behind on what I had hoped to accomplish during it's absents but it will all get done at some point. I'm nearly finished with the tank and just need to seal the top of it along with a few nutplates on the filler tube. I've ordered some carbon fiber vinyl for the panel. I had painted it gloss black but it just isn't worth the effort as I have to redo two of the three panels and gloss black is the absolute hardest to work with.



The white did a good job of hiding the bulkheads in the skin. Nearly every RV12 I've seen has this. Vans says it due to the thin skins.



Sunday, November 13, 2016

Off to the paint shop

Baby Bird made its first big move today - 150 miles to the paint shop. Once it's painted it will be final assembly, finish the avionics, run the engine and work through certification with the FAA. Juan at T&P aero seemed to want to get started first thing so it may be only a few weeks until it's painted. I have several small jobs and one last big job, the fuel tank, that will keep me busy while it's in the shop.

Saturday, October 15, 2016

Two steps back - one step forward build time 1602 hrs

Well it's been quite some time since I posted to the blog. I finished the engine and cowl and purchased the Avionics - which apparently I should have done in reverse order. I purchased the engine first because I wanted to get it painted before final assembly. I then realized that there would be antennas and doublers with the avionics kit so I had to wait on that. I'm a bit concerned that the engine hasn't run in months, not good for engines. We'll do a thorough inspection of the cylinders prior to starting and I'm hopeful it will be fine.

At this point in the build there aren't a lot of pictures that show significant progress. Most of the work involves taking something apart to install some new wire or servo and such. I'm down to this last weekend of work on the plane before we haul it off to the paint shop. Many folks don't paint until post phase 1 test fight in case they have to make major changes. I don't expect that since it's a known entity and many have been built. I've not deviated from the design in a way that would cause major parts of it to be removed or changed and once it's flying I intend to fly it.

The last major piece is the fuel tank which I'll assemble while the plane is in paint. Once it comes back it will take a couple sessions to get the avionics in and tested and I'll do that here at the house. Then, it's off to the hanger for final assembly - still months from flying.

It's also time to dig through all the paper work for registration. It's daunting but as with this entire project just start reading and it all starts to make sense. Time to call Vans for my bill of sale and discuss the registration process. I will also complete my N number registration which is reserved for now - N696VA.

For builders looking into the paperwork process here's a list of items I've compiled so far:



Request a bill of sale from Vans

  1. If you have an RV-12 but do not meet the RV-12 ELSA criteria, you will only receive the 8050-2 bill of sale. If you want the placards they can be purchased at an additional cost. 

1) Aircraft Registration Application, FAA Form 8050-1.
2) Affidavit of Ownership, FAA Form 8050-88 (use version dated 9/98).

3) If a kit aircraft you must also complete FAA Form 8050-2 Bill of Sale and replace the word "aircraft" in the title with "kit."
4) If you want a "special" N-number, send a letter requesting five choices.
5) Appropriate fee: $5.00 ($15.00 for "special" N-number)
Prior to the FAA inspector’s arrival for the final inspection you should obtain:
1) Airworthiness Application, Form 8130-6.
2) Eligibility Statement for Amateur-Built Aircraft, Form 8130-12.

AC 90-89B - Amateur-Built Aircraft and Ultralight Flight Testing Handbook 
http://www.faa.gov/documentLibrary/media/Advisory_Circular/AC_90-89B.pdf

AC20-27G -Certification and Operation of Amateur-Built Aircraft 
https://www.faa.gov/documentLibrary/media/Advisory_Circular/AC%2020-27G.pdf

8130.2H - Airworthiness Certification of Products and Articles 
http://www.faa.gov/documentLibrary/media/Order/8130.2H.pdf

AC-45-2E Identification and Registration Markings
http://www.faa.gov/documentLibrary/media/Advisory_Circular/AC_45-2E.pdf




Questions for Justin:
* Would paint be considered commercial help?
* Certified as EAB - I would like it to be day / night / VFR / IFR - any reason that cannot be done?

* If IFR certification is OK does the plane need to have an IFR navigation installed at the time of certification?

And of course - some pics
All the Avionics - candy for someone like me.
Panel coming together. I'm not going to put too much in until it's painted because they'll be using water and etching prior to primer
The Avionics kit came with the baggage floor pieces that allow inspection without removing the fuel tank. So I decided to add the rear bulkhead split also. I ordered the small piece and took a stab at cutting my existing bulkhead. It would have worked except I mis-drill one hole. So I bit the bullet and ordered the big section also. you can see it behind the old primed bulkhead. It is about 3/4 of an inch more material. One of many parts that have made it to the scrap heap. Hope this pic helps anyone making the same change. The small piece is less than $20 - just make sure to leave enough material (the holes are matched from the small part) and cleco everything as you drill.