Still in section 15 - grinding through the ribs. I've finished the FWD ribs and have the left main ribs debured. I figure 2 to 3 more days until I can assemble the main spar.
Had to take a few weekends off to deal with the Cessna. Pulled the engine out due to a broken cylinder stud. Led to splitting the case, replacing the cam and buying a new prop. The good side is I found it on the ground and not in the air and the wife says hurry up and finish the new plane - the 152 is too needy.
Had to take a few weekends off to deal with the Cessna. Pulled the engine out due to a broken cylinder stud. Led to splitting the case, replacing the cam and buying a new prop. The good side is I found it on the ground and not in the air and the wife says hurry up and finish the new plane - the 152 is too needy.